A.Easy to use and operate
B.Provide instant backup capability for importantdata
C.Capable of parallel processing
D.Capable of load balancing
您可能感兴趣的试卷
你可能感兴趣的试题
A.The selection of inter network transmissionprotocols
B.Determination of router parameters
C.Selection and Design of Routing Protocol
D.Host installation testing steps
A.Convergence layer switches should use deviceswith strong switching capabilities
B.Access layer switches indirectly connect tousers through network adapters
C.The components of the core switch do notsupport hot swapping functionality
D.The router supports IGMP protocol but does notsupport static multicast configuration
A.DQDB can bridge LAN and WAN
B.The network operation using DQDB technologyis independent of the number of workstations
C.Using a dual bus architecture,the operation ofbuses depends on each other
D.DQDB uses optical fiber as the transmissionmedium and can support urban areas with adiameter exceeding 50KM
A.Network Basic Platform
B.Network scheduling platform
C.Network Security Platform
D.Network service platform
A.监理工作目标
B.监理工作依据
C.项目工作范围
D.项目监理机构及配备人员
A.技术负责人
B.商务负责人
C.总监理工程师
D.专业监理工程师
A.旁站的关键部位或关键工序,应按照时间或工序形成完整的记录
B.完成的工程量应写清准确的数值,以便为投资控制提供依据
C.工程因意外情况发生停工,应写清停工原因及承建单位所做的处理
D.主要记述旁站过程中业主单位质量管理体系的管理人员是否到位
A.制定切合实际的监理实施细则
B.审查承建单位对关键部位的测试方案
C.对各种设计文件提出设计质量标准
D.审查承建单位提交的设计方案
A.设置质量控制点有利于对工程质量总目标的分解
B.设置质量控制点易于分析各种干扰条件对有关分项目标产生的影响及其影响程度的测定
C.通过设置上层级质量控制点分项目标的实现,对下层级质量控制点分项目标提供保证
D.由于质量控制点目标单一,且干扰因素便于测定,有利于监理工程师和承建单位的控制管理人员制定、实施纠偏措施和控制对策
A.在总监授权下,主持编制监理规划,审批监理实施细则
B.在总监授权下,检查和监督监理人员的工作,根据工程项目及相关服务项目的进展情况
C.在总监授权下,查承建单位及运维服务提供方的资质,并提出审查意见
D.在总监授权下,参与工程质量事故和其他事故调查
最新试题
下列选项对监理规划描述错误的是()。
The requirements for data backup systems arenot included().
某工程有10项工作,其相互关系如图所示,则该项目工期为()天。
下列选项对监理规划描述错误的是()
信息系统工程建设过程中不需要进行评审的内容有()。
下列选项总监理工程师不能委派给总监代表的权利的是()。
某工程有10项工作,其相互关系如图所示,则该项目工期为44天,工作D的总时差为()天。
下列选项不属于监理大纲内容的是()。
信息系统质量控制的特点描述有误的是()。
下列选项对质量控点描述不正确的是()。