A.ToolsCenter
B.VMware vSphere 4
C.Tivoli Provisioning Manager (TPM)
D.Tivoli Storage Manager (TSM)
您可能感兴趣的试卷
你可能感兴趣的试题
A.Fiber Channel Switch Module
B.Gb Ethernet expansion card
C.Myrinet Cluster expansion card
D.Ethernet Switch Module
A.Reboot the server
B.RSA II
C.LightPath Diagnostics
D.ServerGuide
A.Problem Determination and Service Guide
B.xRef
C.ServerGuide Hardware Reference
D.COG
A.PFA is embedded in selected server components and requires no action for being enabled
B.PFA is available only when the Server Plus Pack is installed on the server
C.PFA is available only when a Virtual Media Key is present
D.PFA is available when the related setting is turned on in UEFI settings
A.CDAT
B.Systems Director
C.Server Guide
D.Tivoli Provisioning Manager for Operational System Deployment (TPMfOSD)
A. Two of DPI C13 Enterprise PDU 39Y8941
B. One of DPI Universal Rack PDU 39Y8951
C. One of DPI C13 Enterprise PDU 39Y8941
D. Two of DPI C19 Enterprise PDU 39Y8948
A.Turn over current design to Techline to create configurations
B.Perform knowledge transfer of design requirements to Business partner then disengage
C.Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)
D.Work with business partner to engage Techline to create configurations
A.FlashCopy is not supported on the DS3000
B.Remote mirroring is supported on the DS3000
C.FlashCopy is supported on the BladeCenter S RAIDed SAS Switch Modules
D.FlashCopy is not supported on BladeCenter S RAIDed SAS Switch Modules
A.x3650 M3 with Microsoft Virtual Server
B.BladeCenter JS43 with VMware
C.x3850 X5 with VMware
D.BladeCenter HS22V with VMware
最新试题
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
A customer who is reducing their technical staff has requested an Intel server proposal from various vendors. Which of the following is most relevant to this proposal?()
Which IBM System Director task will give you the ability to update firmware and device drivers on System x servers?()
A retail customer has a database server that requires more than 64Gb memory and four or more processors sockets. Which of the following system x servers meets this requirements?()
A customer needs maximum performance with fault-tolerance from their disk subsystem. Which RAID level meets this requirement?()
An installed manufacturing customer has a mission-critical application that requires a rack mount server that will protect them against downtime in the event memory DIMM failure occurs. They also need load balancing, fault tolerant NICS and redundant power supplies and fans. Which of the following servers meets these requirements.()
A Customer has a functional server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible. What method can achieve this?()
A customer wants a Blade to run a very memory intensive application. They require 48 GB with later expansion to 160 GB using 4 GB DIMMs. Which of the following products supports this requirement?()
A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()