A.Problem Determination and Service Guide
B.xRef
C.ServerGuide Hardware Reference
D.COG
您可能感兴趣的试卷
你可能感兴趣的试题
A.PFA is embedded in selected server components and requires no action for being enabled
B.PFA is available only when the Server Plus Pack is installed on the server
C.PFA is available only when a Virtual Media Key is present
D.PFA is available when the related setting is turned on in UEFI settings
A.CDAT
B.Systems Director
C.Server Guide
D.Tivoli Provisioning Manager for Operational System Deployment (TPMfOSD)
A. Two of DPI C13 Enterprise PDU 39Y8941
B. One of DPI Universal Rack PDU 39Y8951
C. One of DPI C13 Enterprise PDU 39Y8941
D. Two of DPI C19 Enterprise PDU 39Y8948
A.Turn over current design to Techline to create configurations
B.Perform knowledge transfer of design requirements to Business partner then disengage
C.Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)
D.Work with business partner to engage Techline to create configurations
A.FlashCopy is not supported on the DS3000
B.Remote mirroring is supported on the DS3000
C.FlashCopy is supported on the BladeCenter S RAIDed SAS Switch Modules
D.FlashCopy is not supported on BladeCenter S RAIDed SAS Switch Modules
A.x3650 M3 with Microsoft Virtual Server
B.BladeCenter JS43 with VMware
C.x3850 X5 with VMware
D.BladeCenter HS22V with VMware
最新试题
Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()
Customer is asking if new IBM UEFI recognizes their Windows 2003 Enterprise Operational System. What is the correct answer?()
A customers has asked you to investigate their current x86 server environment to determinate if they can achieve a reduction in power and rack consumption. They plan to implement VMware and the local storage shared. Which of the following consolidation proposals meets these needs?()
A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()
An installed manufacturing customer has a mission-critical application that requires a rack mount server that will protect them against downtime in the event memory DIMM failure occurs. They also need load balancing, fault tolerant NICS and redundant power supplies and fans. Which of the following servers meets these requirements.()
A customer wants to update their system with the lasted drivers. Which the following tool you suggest?()
Which IBM System Director task will give you the ability to update firmware and device drivers on System x servers?()
A new IBM x 3650 M3 customer has experienced support issues with problem resolution from their previous vendor. The biggest problem was with Microsoft applications failing intermittently. Which of the following IBM products covers this issue?()
A customer who is reducing their technical staff has requested an Intel server proposal from various vendors. Which of the following is most relevant to this proposal?()