Your physical environment is configured as shown in the network diagram. The firewall in the diagram is a generic hardware based firewall product.
You are planning to deploy a Windows Server 2008 R2 Hyper-V server to virtualize your current physical environment. You have the following requirements:
- The Web server VM in the perimeter network (also known as DMZ) must be able to communicate with only the SQL Server computer VM through the firewall.
- The SQL Server computer VM must be able to communicate with the Web server VM.
- The client computer VM must be able to communicate with the Web server VM.
- Two dedicated iSCSI networks must available to the SQL Server computer VM.
- A dedicated management interface must be available for the Hyper-V server.
You need to choose the appropriate virtual network configuration.
Which networking solution should you choose?()
A.Two external networks and four internal networks
B.Three external networks and two private networks
C.One external network and four private networks
D.Two external networks and three private networks
您可能感兴趣的试卷
你可能感兴趣的试题
You plan to deploy two virtual machines (VMs) that will run Microsoft Exchange Server 2010 and will have the Mailbox server role installed. The VMs will have access to only the local disks on the Hyper-V hosts.
You need to recommend a solution to ensure that the Exchange Server Mailbox services are available if a single VM fails.
What should you include in the recommendation?()
A.Virtual Machine Chimney
B.Windows System Resource Manager (WSRM)
C.Network Attached Storage (NAS)
D.virtual machine queue (VMQ)
E.pass-through disks
F.Microsoft System Center Operations Manager with Performance and Resource Optimization (PRO)
G.Network Load Balancing (NLB) for the Hyper-V hosts
H.an iSCSI Storage Area Network (SAN)
I.a failover cluster between the VMs
J.quick migration
K.Microsoft System Center Virtual Machine Manager 2008 R2
L.a failover cluster for the Hyper-V hosts
M.a Fibre Channel Storage Area Network (SAN)
N.Cluster Shared Volumes (CSV)
O.Network Load Balancing (NLB) for the VMs
P.Second-Level Address Translation (SLAT)
Your environment includes a Windows Server 2008 R2 Hyper-V failover cluster and a single Windows Server 2008 R2 Hyper-V server. You are designing a migration strategy.
You need to ensure that you can perform a SAN migration to move virtual machines (VMs) from the single server into the failover cluster.
Which two actions should you perform?()
A.Install Microsoft System Center Virtual Machine Manager (VMM) 2008 R2
B.Install a Virtual Disk Service (VDS) hardware provider
C.Use Cluster Shared Volumes (CSVs) to store the VM files
D.Add the Storage Manager for SANs feature
Your network includes Windows Server 2008 R2 Hyper-V servers.
You are configuring the servers in a failover cluster that will host highly available virtual machines (HAVMs). You plan to manage the servers in the cluster by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2.
You need to design a storage solution for the cluster that allows you to migrate virtual machines (VMs) into and out of the cluster by using SAN migration.
Which two actions should you include in your design?()
A.Install a Virtual Disk Service (VDS) hardware provider on each node in the cluster
B.Enable the auto mount feature on each node in the cluster
C.Place all VMs on a dedicated logical unit number (LUN)
D.Place all VMs on a single Cluster Shared Volume (CSV)
Your virtual environment includes several Windows Server 2008 R2 Hyper-V servers. Some servers have 16 GB of RAM, and some servers have 32 GB of RAM. Each server has a dedicated management network adapter. Several virtual machines (VMs) are configured on local disk arrays.
You plan to enable live migration between all Hyper-V host servers. Your plan must optimize the environment for live migration and enable the live migration of all VMs among all servers. You need to specify the components to add or upgrade.
What should you do?()
A.Install additional RAM as necessary so that all host servers have the same amount of RAM. Add a second network adapter to each host server, and assign this network adapter to a local switch
B.On each Hyper-V host server, provision additional disk resources on the local storage volumes. Install additional RAM as necessary so that all host servers have the same amount of RAM
C.On each Hyper-V host server, provision additional disk resources on the local storage volumes. Add a second network adapter to each host server, and assign this network adapter to a local switch
D.On each Hyper-V host server, provision additional disk resources on shared storage volumes. Add a second network adapter to each host server, and assign this network adapter to a local switch
Your network contains 10 servers that run Windows Server 2008 R2 Enterprise. The servers are configured as shown in the following table.
Server1 and Server2 are members of the same failover cluster. Both servers are connected to a Fibre Channel Storage Area Network (SAN) by using four Fibre Channel connections per server. You need to ensure that communication between the hosts and the SAN is distributed between all of the Fibre Channel connections.
What should you implement?()
A.Multipath I/O
B.Failover Clustering on the VMs
C.a differencing VHD
D.Cluster Shared Volumes (CSV)
E.Network Load Balancing (NLB) on the VMs
F.a dynamically expanding VHD
G.network adapter teaming
H.Windows System Resource Manager (WSRM)
I.a pass-through disk
J.round robin DNS
K.Network Load Balancing (NLB) on the Hyper-V hosts
L.Performance and Resource Optimization (PRO)
M.SQL Server Resource Governor on the Hyper-V hosts
You have two hosts that run VMware ESX.
You need to recommend a management solution for the virtual machines (VMs) on the VMware hosts. The solution must support the ability to move the VMs from one VMware host to the other VMware host by using VMware vMotion technology.
What should implement on the network?()
A.a failover cluster between the VMs
B.Second-Level Address Translation (SLAT)
C.a failover cluster for the Hyper-V hosts
D.virtual machine queue (VMQ)
E.quick migration
F.Virtual Machine Chimney
G.Microsoft System Center Operations Manager with Performance and Resource Optimization (PRO)
H.Network Attached Storage (NAS)
I.Network Load Balancing (NLB) for the VMs
J.Network Load Balancing (NLB) for the Hyper-V hosts
K.Windows System Resource Manager (WSRM)
L.Microsoft System Center Virtual Machine Manager 2008 R2
M.Cluster Shared Volumes (CSV)
N.pass-through disks
O.a Fibre Channel Storage Area Network (SAN)
P.an iSCSI Storage Area Network (SAN)
You plan to deploy a RemoteApp solution.
You plan to install the Remote Desktop Session Host (RD Session Host) role service on a server named Server1 You need to recommend a solution that prevents a single connection to Server1 from using more than 10 percent of the available CPU resources on the server.
What should you include in the recommendation?()
A.Windows System Resource Manager (WSRM)
B.Microsoft System Center Operations Manager
C.Microsoft System Center Virtual Machine Manager
D.Microsoft Application Virtualization (App-V)
You deploy applications by using the Microsoft Application Virtualization (App-V) Full Infrastructure Model You need to recommend a solution to manage the App-V Desktop Client settings.
What should you include in the recommendation?()
A.The App-V System Deployment SuperFlow
B.the App-V Dynamic Suite Composition Tool
C.the App-V Sequencer
D.the App-V Client ADM Template
Your network contains 10 servers that run Windows Server 2008 R2 Enterprise. The servers are configured as shown in the following table.
Server1 and Server2 are members of the same failover cluster. Both servers are connected to a Fibre Channel Storage Area Network (SAN) by using four Fibre Channel connections per server. You need to ensure that a virtual machine (VM) moves automatically by using Hyper-V live migration when the network utilization of the current host exceeds an administrator-defined threshold.
What should you implement?()
A.Cluster Shared Volumes (CSV)
B.a dynamically expanding VHD
C.SQL Server Resource Governor on the Hyper-V hosts
D.Failover Clustering on the VMs
E.a differencing VHD
F.Network Load Balancing (NLB) on the Hyper-V hosts
G.Windows System Resource Manager (WSRM)
H.network adapter teaming
I.Performance and Resource Optimization (PRO)
J.a pass-through disk
K.Multipath I/O
L.Network Load Balancing (NLB) on the VMs
M.round robin DNS
You have a Windows Server 2008 R2 Hyper-V server. Virtual machines (VMs) store data on pass- through disks.
You need to design a backup solution that allows you to restore VMs.
What should you do?()
A.Back up the VMs by using Windows Server Backup within the VMs
B.Create checkpoints of the VMs by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2
C.Back up the system state on the VMs by using Windows Server Backup within the VMs
D.Back up the Hyper-V server by using Microsoft System Center Data Protection Manager (DPM) 2007 with SP1
最新试题
All servers on your network run Windows Server 2008 R2.You are planning a deployment of a virtual desktop infrastructure (VDI). You need to estimate the number of servers required for the deployment.Which factor should you consider?()
Your network contains a Hyper-V server named Server1 that runs Windows Server 2008 R2. Server1 has four physical network adapters and will run eight virtual machines (VMs).You need to identify the maximum number of internal, external and private virtual networks that you can create on Server1.How many internal, external and private virtual networks can you create?To answer, drag the appropriate number of virtual networks to the correct virtual network type in the answer area.
Your network includes Windows Server 2008 R2 Hyper-V failover clusters that support highly available virtual machines (VMs). You manage virtual machines by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2.You are planning to deploy a large number of VMs to the failover clusters. All VMs must remain available when one node of each cluster is offline.You need to determine the best placement for the new VMs among the clusters.Which two actions should you perform?()
Your company’s network includes 150 client computers that run Windows Vista Business. The company does not participate in the Microsoft Software Assurance program.You plan to implement a virtual desktop infrastructure (VDI) that includes 150 VDI sessions. You acquire three new servers that have four quad-core CPUs each. You need to choose the appropriate licenses.Which licensing solution should you choose?()
Your network contains a Hyper-V host named Host1 that runs Windows Server 2008 R2. You plan to deploy four virtual machines (VMs) named VM1, VM2, VM3, and VM4 to Host1. You need to recommend which network configuration must be used on Host1 to meet the following requirements:-VM1 must only be able to connect to VM3.-VM2 and VM4 must be able to connect to Hostl and to other servers on the network.Which network configuration should you recommend?To answer, drag the appropriate network type to the correct VM in the answer area.
You plan to implement Hyper-V virtualization to test applications.In the test environment, you will take frequent snapshots of virtual machines (VMs).You need to recommend which disk types you should use for the planned deployment of the VMs.Which disk types should you recommend?()
You plan to implement Hyper-V live migration.You configure the Hyper-V hosts to connect to a shared storage.You need to prepare the Hyper-V hosts for the implementation of live migration.What should you configure on the Hyper-V hosts?()
Your highly available virtual environment includes Windows Server 2008 R2 Hyper-V servers. You are developing a strategy to apply Hyper-V updates.You need to ensure that you can deploy updates while minimizing server downtime.What should you do on each Hyper-V server?()
All servers on your company’s network run Windows Server 2008 R2.The company is planning to virtualize a memory-intensive server application.You need to recommend CPUs for the virtualization host server. The CPUs must enable memory management enhancements in Microsoft Hyper-V Server 2008 R2.What are two possible CPU recommendations that will achieve this goal?()
You plan to deploy two virtual machines (VMs) that will be configured as nodes in a failover cluster. The VMs will run file and print services. You need to recommend a storage solution for the planned deployment.What should you include in the recommendation?()