Your virtual environment includes Windows Server 2008 R2 Hyper-V servers. You plan to deploy Microsoft Virtual Desktop Infrastructure. You plan to scale both static and dynamic deployments across several servers. You need to design a plan that supports static and dynamic deployments and that allows for capacity growth without outages.
What should you include in your plan?()
A.Use DNS round-robin and network load balancing
B.Use network load balancing and failover clustering
C.Use the Remote Desktop Gateway and network load balancing
D.Use the Remote Desktop Connection Broker and failover clustering
您可能感兴趣的试卷
你可能感兴趣的试题
Your network includes the following elements: VMware ESX 3.5 serversWindows Server 2008 R2 Hyper-V serversMicrosoft System Center Virtual Machine Manager (VMM) 2008 R2 with the Subsystem for UNIX-based Applications feature installed You run several ESX-hosted virtual machines (VMs) from an NFS share, and you run several Hyper-V VMs from a Windows file share. You need to migrate the ESX-hosted VMs to Hyper-V.
Which two actions should you perform?()
A.Shut down the VMs
B.Copy the .vmx and .vmdk files to the VMM library
C.Copy the .vmx and .vmdk files from the NFS share to the Windows file share
D.Run the New-V2V PowerShell cmdlet and point to the .vmx files
Your company uses Windows Server 2008 R2 Hyper-V servers to provide a Microsoft Virtual Desktop Infrastructure (VDI) environment.
Maintenance tasks result in reduced capacity on several servers. You need to prevent servers from experiencing performance problems during maintenance.
What should you do?()
A.Set the user logon mode on every server to Enabled
B.Create additional DNS A records for the servers, and use DNS round-robin
C.In Remote Desktop Connection Broker, assign a lower weight to the servers that will undergo maintenance
D.In Remote Desktop Connection Broker, assign a higher weight to the servers that will undergo maintenance
Client computers on your network run either Windows Vista or Windows 7.
You plan to use Microsoft Application Virtualization (App-V) 4.5 with SP1 as an application virtualization platform. You need to virtualize applications by using mount point installations (MNT).
What should you do?()
A.Configure the App-V Sequencer to have two partitions
B.Configure the App-V Sequencer on a Windows 7 client computer
C.Configure virtualized applications to check for updates during installation
D.On the reference computer, install all software that typically runs on client computers
Your network environment includes the following elements: Two Windows Server 2008 R2 Hyper-V serversTwo VMware ESX 3.5 serversMicrosoft System Center Virtual Machine Manager (VMM) 2008 R2
You run several Windows Server 2003 virtual machines (VMs) on your ESX host servers. You need to convert the ESX VMs to Hyper-V, and you must minimize the downtime during the conversion.
What should you do?()
A.Run the New-V2V PowerShell cmdlet
B.Perform a physical-to-virtual (P2V) conversion while the VMs are running
C.Shut down the VMs, and then perform a virtual-to-virtual (V2V) conversion
D.Shut down the VMs, and then perform a physical-to-virtual (P2V) conversion
Your network includes Windows Server 2008 R2 Hyper-V failover clusters that support highly available virtual machines (VMs).
You manage virtual machines by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are planning to deploy a large number of VMs to the failover clusters. All VMs must remain available when one node of each cluster is offline. You need to determine the best placement for the new VMs among the clusters.
Which two actions should you perform?()
A.For each cluster, set the cluster reserve to 1
B.In each cluster, place one host server in maintenance mode
C.Determine the placement for each VM by using the data that is generated by running the Get-VMHostRating PowerShell cmdlet
D.Determine the placement for each VM by using the data that is generated by running the Get-VMPerformance PowerShell cmdlet
All servers in your environment run Windows Server 2008 R2. You are planning a Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 Self-Service Portal deployment.
You need to ensure that members of the Security Compliance group can create new virtual machines (VMs). You install the VMM 2008 R2 Self Service Portal and add the Security Compliance group to the Self Service host group.
What should you do next?()
A.Assign the computer accounts for all Hyper-V servers the Read permission to the library share and NTFS folders. Grant the Log on as a service right to the Security Compliance group
B.Assign the service account for the Hyper-V Image Management Service the Read permission to the library share and NTFS folders. Grant the Log on as a service right to the service account for the Hyper-V Image Management Service
C.Configure the self-service user role to create new VMs. Add the Security Compliance group to the self-service user role. Grant members of the self-service user role access to the library share
D.Configure constrained delegation for the Security Compliance group on the library server. Grant the Log on as a service right to the service account for the Hyper-V Image Management Service
Your virtual environment includes Windows Server 2008 R2 Hyper-V servers. The test and development teams are developing a distributed application.
The application requires a domain controller, a server that runs Microsoft SQL Server, an application server, and a client computer. The application uses pass-through authentication. You need to ensure that at the time of a failure, the test team can reproduce the error and provide the application in the state in which it existed when the error occurred to the development team for continued analysis. You must achieve this goal while minimizing storage requirements.
What should you do?()
A.Snapshot and export all servers
B.Snapshot and export only the application server
C.Snapshot the application server, and back up the SQL Server database
D.Snapshot and export only the domain controller and the client computer
You have a two-node Hyper-V failover cluster that uses SAN storage. You are designing storage for a new virtualization environment by using Windows Server 2008 R2.
You plan to deploy five virtual machines (VMs) per logical unit number (LUN). You need to be able to perform a live migration of a single VM while the other VMs continue to run on the host server.
What should you do?()
A.Use Cluster Shared Volumes (CSVs)
B.Use fixed disks on the SAN storage
C.Boot the virtual machines from iSCSI LUNs
D.Use dynamically expanding disks on an iSCSI LUN
You are designing a test environment that uses Hyper-V. The test environment must enable testers to perform the following tasks:
Quickly switch between running states.Re-create a specific state or condition.Return the state of the environment to a specific point in time.Recover from a faulty software update by using the fastest method. You need to ensure that the test environment meets the requirements.
What are two possible tools that you can use to achieve this goal?()
A.Hyper-V Manager
B.Microsoft System Center Data Protection Manager (DPM) 2007 with SP1
C.Microsoft System Center Virtual Machine Manager (VMM) 2008 R2
D.Microsoft System Center Configuration Manager (SCCM) 2007 with SP3
最新试题
You have a Windows Server 2008 R2 Hyper-V failover cluster that has 16 nodes. You plan to load- balance eight virtual machines (VMs) on the Hyper-V failover cluster by using network load balancing (NLB). You need to ensure that the NLB cluster converges.What should you do?()
Your network contains four computers. The computers are configured as shown in the following table:You plan to deploy the following:-Four Hyper-V servers that run Windows Server 2008 R2 Service Pack l (SP1)-One server that has Microsoft System Center Virtual Machine Manager 2008 R2 installedYou need to recommend a solution to perform physical-to-virtual machine (P2V) conversions of the computers. The solution must minimize downtime on the computers. What should you recommend?To answer, drag the appropriate conversion type to the correct computer in the answer area.
You plan to implement four Hyper-V hosts named Server1, Server2, Server3, and Server4. The Hyper-V hosts will have the following configurations:-Server3 will host one virtual machine (VM).-Server4 will host four VMs.-Serverl and Server2 will be clustered in a Hyper-V host cluster.-The Hyper-V host cluster will host two VMs.-All VMs will run Windows Server 2008 R2 Standard.You need to recommend which operating system must be installed on each Hyper-V host. The solution must minimize licensing costs.Which operating system should you recommend for each Hyper-V host?To answer, drag the appropriate operating system to the correct Hyper-V host in the answer area.
Your network contains five unused Hyper-V hosts. The unused Hyper-V hosts are configured as shown in the following table.You need to identify which two servers can be used to create a Hyper-V host cluster. The Hyper-V cluster must support Hyper-V live migration. Which servers should you identify?To answer, drag the appropriate servers to the correct Hyper-V host cluster in the answer area.
Your network environment includes two Windows Server 2008 R2 Hyper-V servers and one VMware ESX 3.5 host server.You are designing a Microsoft System Center Virtual Machine Manager (SCVMM) 2008 R2 implementation to manage your network environment. SCVMM must be able to perform management tasks that require file transfer operations between your VMware server and your Windows servers.You need to configure the ESX host server to ensure that file transfer operations are encrypted, and follow security best practices.What should you do?()
You are designing a Windows Server 2008 R2 Hyper-V environment.You need to be able to dynamically add new storage to Windows virtual machines (VMs).What should you do?()
You plan to implement Hyper-V live migration.You configure the Hyper-V hosts to connect to a shared storage.You need to prepare the Hyper-V hosts for the implementation of live migration.What should you configure on the Hyper-V hosts?()
Your company’s network includes 150 client computers that run Windows Vista Business. The company does not participate in the Microsoft Software Assurance program.You plan to implement a virtual desktop infrastructure (VDI) that includes 150 VDI sessions. You acquire three new servers that have four quad-core CPUs each. You need to choose the appropriate licenses.Which licensing solution should you choose?()
Your virtual environment includes Microsoft Virtual Server 2005 R2 and third-party hypervisors. The virtual machines (VMs) include messaging, application, and database servers. You intend to standardize on Windows Server 2008 R2 Hyper-V servers.You are developing a migration plan by using the Microsoft Assessment and Planning (MAP) Toolkit.You need to gather the necessary information to analyze the current virtual environment.Which MAP assessment should you choose?()
Your network contains two Hyper-V hosts that run Windows Server 2008 R2 Service Pack 1 (SP1). The hosts are configured as shown in the following table.You plan to deploy four virtual machines (VMs) that have the resource requirements shown in the following table.All of the VMs will run simultaneously.You need to recommend a hosting location for the VMs. What should you recommend? To answer, drag the appropriate VMs to the correct Hyper-V host in the answer area.