A.discharge side of condenser
B.discharge side of compressor
C.outlet of the evaporator
D.receiver tank
您可能感兴趣的试卷
你可能感兴趣的试题
A.increase the amount of cooling water to the condenser
B.decrease the amount of cooling water to the condenser
C.add more refrigerant to the system
D.remove some of the refrigerant from the system
A.the relief valve should open before the high-pressure cutout
B.the relief valve should open and let excess refrigerant go to receiver
C.the high-pressure cutout switch should operate before the relief valve opens
D.close in on the suction valve
A.finished joints
B.welded joints
C.ground joints
D.soldered joints
A.a clogged scale trap
B.air in the system
C.automatic controls not functioning properly
D.insufficient cooling water to the condenser
A.separating chamber
B.system of baffles
C.purge valve
D.vacuum reducing valve
A.saltwater side of the condenser
B.refrigerant side of the condenser
C.in the evaporator coils
D.in the suction strainer
A.cutout
B.pressure controller
C.controller switch
D.cutout switch
A.remove any air that may accumulate in the system
B.take out unpleasant fumes from the refrigerant
C.vent off excess refrigerant in an emergency
D.permit opening the refrigerating system for cleaning and inspecting
A.to increase the system efficiency by sensible heat transfer
B.to stop the liquid from flashing
C.to reduce the load on the compressor
D.to remove latent heat of vaporization and the suction piping transfer
A.its pressure and temperature are both lowered
B.its pressure and temperature are both raised
C.its pressure is lowered and its temperature is raised
D.its pressure is raised and its temperature is lowered
最新试题
Under MARPOL Code the ship to which it applies has to carry ()
If separating effect is not good, which measure should be taken ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
To proceed to the assistance of a ship in distress is()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Cold weather starting of a diesel engine may be made easier by()