单项选择题When carrying out mooring trial, if the M√Ecan’t start normally, you should ()

A.take a further inspection in the voyage
B.check and repair, then retrial
C.do as the surveyor’s requirement
D.retrial


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题When carrying out mooring trial, the () trial of the MEis not necessary.

A.starting
B.torsion vibration
C.direction changing
D.running

2.单项选择题()does not belong to the mooring trial item.

A.generator sets running trial
B.shafting intensity trial
C.the trail for pumps that working for ME
D.ME safety devices trial

3.单项选择题According to the regulation of the voyage trial on new ship,()is one of the trial items of the UMS ship bridge control.

A.starting and direction changing trial
B.cancelling accelerating function trial
C.lowest stable speed trial
D.continuous running trial

5.单项选择题During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()

A.chief engineer
B.the engineer
C.captain
D.any member of the engine department

6.单项选择题When the vessel entering the dock, the first work that engineer should contact with the shipyard ()

A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply

7.单项选择题When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()

A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power

8.单项选择题During the deck repair,() should be measured firstly before tail shaft is drawn out.

A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection

9.单项选择题To ensure the quality of dock repair, C/E should know very well ()

A.the repair standard of main docking repair item
B.the special tool for repair item
C.the skill of repairer
D.the status of docking repair equipment

10.单项选择题Which of the following items don’t belong to dock repair works?()

A.making the repair list, booking spare parts and special tools for the dock repair
B.shutting off all of the SW valves to outboard
C.the sketches or diagrams used for the dock repair
D.cleaning up the oil tank and boiler before enter the dock