A.chief engineer
B.surveyor
C.the engineer
D.the technique personnel of the shipyard
您可能感兴趣的试卷
你可能感兴趣的试题
A.chief engineer
B.the engineer
C.captain
D.any member of the engine department
A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply
A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection
A.the repair standard of main docking repair item
B.the special tool for repair item
C.the skill of repairer
D.the status of docking repair equipment
A.making the repair list, booking spare parts and special tools for the dock repair
B.shutting off all of the SW valves to outboard
C.the sketches or diagrams used for the dock repair
D.cleaning up the oil tank and boiler before enter the dock
A.the SW outboard valves
B.the tailshaft LO stop valve
C.the drain valve of the boiler
D.propeller shaft sealing device
A.sea valve chest, sect valve, thruster
B.bilge motherboard, steering and the shaft system
C.sea water system
D.fresh water system
We should apply for annual spare parts according to()
Ⅰ.he need of annual overhaul
Ⅱ.he storage of spare parts
Ⅲ.he storage capacity of spare parts room
A.Ⅰ
B.Ⅱ
C.Ⅰ+Ⅱ
D.Ⅲ
A.quality
B.reliability
C.price fluctuating
D.applicability
最新试题
The cetane rating of diesel fuel is an indication of the ()
Diesel engine air start system check valves are opened by ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Which of the following items don’t belong to dock repair works?()
Cold weather starting of a diesel engine may be made easier by()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()