单项选择题The purpose of engine stand-by is that ()

A.the main engine in the stand-by condition
B.auxiliary machinery in the stand-by condition
C.dynamical equipments in the stand-by condition and could be used immediately
D.A and B


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Which is false about engine trials?()

A.engine trails should be done after finishing the operation of turning the engine with the turning gear and starting the engine on air briefly
B.in the operation of engine trails, the main engine should be running in low-speed
C.As to the ship equipment with twin main engine, engine trials should be done with one engine ahead and another engine astern at the same time
D.the order “engine trials” should be given by the bridge

2.单项选择题Which of the following is false?()

A.preparation for stand-by should be organized by engine room
B.engine trails should be agreed with bridge, and then do it
C.As to engine trials of the twin diesels and two propellers, the two diesels should use “slow ahead” at the same time
D.After engine trials, the handle of the engine telegraph should be put in the “stop” position

4.单项选择题One hour before sailing, the duty engineer and officer should check ()

A.tachometer and engine telegraph
B.oil and water reserves
C.clock and engine telegraph and test the rudder
D.crews

5.单项选择题When stand-by before sailing, the duty engineer and officer should check clock, engine telegraph and rudder, and then write it in the ()

A.engine room logbook
B.voyage logbook
C.engine room logbook or voyage logbook
D.engine room logbook and voyage logbook

6.单项选择题() is (are) not power supplied by main switchboard directly.

A.Steering gear and windlass
B.Navigation light and radio power panel
C.Navigation device power box
D.Daily fresh water pump

7.单项选择题()is power supplied by main switchboard directly not through sub-board.

A.Deck machinery
B.Little power load
C.Some important load
D.stationary submersible pump

8.单项选择题()are located on the road panel of main switchboard.

A.Megohm meter, insulation light and synchroscope
B.Synchroscope, synchro light and megohm meter
C.Shore power switch, insulation light and synchroscope
D.Megohm meter, insulation light and shore power switch

9.单项选择题Insulation light is located on.() of main switchboard.

A.Paralleling panel
B.Load panel
C.Emergency generator control pane
D.Main generator control pane

10.单项选择题Synchrocope and synchro light are located on () of main switchboard.

A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel