单项选择题One hour before sailing, the duty engineer and officer should check ()

A.tachometer and engine telegraph
B.oil and water reserves
C.clock and engine telegraph and test the rudder
D.crews


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题When stand-by before sailing, the duty engineer and officer should check clock, engine telegraph and rudder, and then write it in the ()

A.engine room logbook
B.voyage logbook
C.engine room logbook or voyage logbook
D.engine room logbook and voyage logbook

2.单项选择题() is (are) not power supplied by main switchboard directly.

A.Steering gear and windlass
B.Navigation light and radio power panel
C.Navigation device power box
D.Daily fresh water pump

3.单项选择题()is power supplied by main switchboard directly not through sub-board.

A.Deck machinery
B.Little power load
C.Some important load
D.stationary submersible pump

4.单项选择题()are located on the road panel of main switchboard.

A.Megohm meter, insulation light and synchroscope
B.Synchroscope, synchro light and megohm meter
C.Shore power switch, insulation light and synchroscope
D.Megohm meter, insulation light and shore power switch

5.单项选择题Insulation light is located on.() of main switchboard.

A.Paralleling panel
B.Load panel
C.Emergency generator control pane
D.Main generator control pane

6.单项选择题Synchrocope and synchro light are located on () of main switchboard.

A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel

7.单项选择题To () , the power is supplied by main switchboard directly not though sub-board.

A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load

8.单项选择题()is not installed on the main switchboard.

A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay

9.单项选择题()is used to control, modulate, monitor and protect generator set.

A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar

10.单项选择题()is not a part of the main switchboard.

A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box