单项选择题()are located on the road panel of main switchboard.

A.Megohm meter, insulation light and synchroscope
B.Synchroscope, synchro light and megohm meter
C.Shore power switch, insulation light and synchroscope
D.Megohm meter, insulation light and shore power switch


您可能感兴趣的试卷

你可能感兴趣的试题

1.单项选择题Insulation light is located on.() of main switchboard.

A.Paralleling panel
B.Load panel
C.Emergency generator control pane
D.Main generator control pane

2.单项选择题Synchrocope and synchro light are located on () of main switchboard.

A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel

3.单项选择题To () , the power is supplied by main switchboard directly not though sub-board.

A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load

4.单项选择题()is not installed on the main switchboard.

A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay

5.单项选择题()is used to control, modulate, monitor and protect generator set.

A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar

6.单项选择题()is not a part of the main switchboard.

A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box

7.单项选择题()is not a part of the main switch board.

A.Control panel of main generator
B.Control panel of emergency generator
C.Paralleling panel
D.Load panel of main generator

8.单项选择题()are supplied by main switchboard directly.

A.Suez Canal searchlight, air compressor and air conditioning compressor
B.Air compressor, boiler blower and refrigeration plant
C.Boiler blower, Suez Canal searchlight and refrigeration plant
D.Suez canal searchlight, air compressor and boiler blower

9.单项选择题After resolving the trouble of main power supply, main switch of emergency generator should(), if power supply is refreshed.

A.be switched off by the duty officer
B.be switched on by the duty officer
C.be switched off automatically
D.be switched on automatically

10.单项选择题Emergency generator is installed on board mainly to ()

A.connect to the busbar when the load increasing
B.supply power specially to charging panel
C.be put into operation during the ship arriving at or leaving port
D.ensure the power supply to critical equipment after the main switchboard out of power