A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel
您可能感兴趣的试卷
你可能感兴趣的试题
A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box
A.Control panel of main generator
B.Control panel of emergency generator
C.Paralleling panel
D.Load panel of main generator
A.Suez Canal searchlight, air compressor and air conditioning compressor
B.Air compressor, boiler blower and refrigeration plant
C.Boiler blower, Suez Canal searchlight and refrigeration plant
D.Suez canal searchlight, air compressor and boiler blower
A.be switched off by the duty officer
B.be switched on by the duty officer
C.be switched off automatically
D.be switched on automatically
A.connect to the busbar when the load increasing
B.supply power specially to charging panel
C.be put into operation during the ship arriving at or leaving port
D.ensure the power supply to critical equipment after the main switchboard out of power
A.Ammeter
B.Voltmeter
C.Wattmeter
D.Synchroscope
A.argo winch
B.Windlass
C.Steering gear
D.Air compressor
最新试题
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
If separating effect is not good, which measure should be taken ()
To proceed to the assistance of a ship in distress is()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
The main purpose of port State control is not to()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Cold weather starting of a diesel engine may be made easier by()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The treatment of the fuel oils involves storage, heating, filtering and()