A.both as clarifiers
B.first one as clarifiers, second one as purifier
C.both as purifiers
D.first one as purifier, second one as clarifier
您可能感兴趣的试卷
你可能感兴趣的试题
A.the plant should be prohibited to supplying air
B.the plant should work at intervals
C.the plant should be added disinfector in time
D.we should check strength of activated sludge, ivory-white color is best
A.chlorine water
B.ozone
C.hypo-calcium chloride
D.calcium oxide
A.deposition chamber
B.oxidation pool
C.disinfection chamber
D.all chamber
When does auxiliary burner of rotary nozzle incinerator begin to work? ()
Ⅰ.hen igniting
Ⅱ.he sludge for dealing with is too much
Ⅲ.efore stopping incinerator
A.Ⅰ+Ⅱ
B.Ⅰ+Ⅲ
C.Ⅱ+Ⅲ
D.Ⅰ+Ⅱ+Ⅲ
A.After stopping supplying sludge oil, the value and pipe should be flushed by flushed by diesel oil and the incinerator continue burning for 10 minutes
B.Close auxiliary burner firstly and then close main burner
C.After stopping fuel, restoring the position of main fuel supply valve
D.Stop blower as soon as stopping supplying fuel oil
A.Scavenging time should be more 30 seconds before igniting
B.The temperature of sludge tank is 80~100℃
C.First igniting the incinerator with diesel oil, when the temperature of health is about 600℃, the sludge oil drawn in
D.The ash can be dumped into sea when the distance is more than 3 miles from land
When does auxiliary burner of incinerator put into operation? ()
Ⅰ.tart incinerator when it is cold
Ⅱ.he sludge for dealing with is little
Ⅲ.he sludge for dealing with is large
Ⅳ.he water and impurity in sludge are too much
Ⅴ.he temperature in incinerator is low
Ⅵ.ealing with little solid rubbish
A.Ⅰ+Ⅱ+Ⅲ+Ⅴ
B.Ⅰ+Ⅱ+Ⅲ+Ⅳ
C.Ⅰ+Ⅳ+Ⅴ+Ⅵ
D.Ⅰ+Ⅱ+Ⅲ+Ⅵ
A.filled with clean water before operation
B.keep air cushion in oil collecting space during running
C.check oil level during running
D.clean inner separator with low pressure stream
A.pay attention to operating parameters
B.renew and clean separating units in time
C.check oil level in separator to prevent overload
D.check separating effect, if it is bad, flush with large capacity water pump
A.overhauling every two year
B.working at intervals
C.renewing filtration material
D.pumping bilge water from different layers respectively
最新试题
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Which of the following items don’t belong to dock repair works?()
The cetane rating of diesel fuel is an indication of the ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The ISPS Code consists of a mandatory section-Part A, which shows()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
To proceed to the assistance of a ship in distress is()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()