When does auxiliary burner of incinerator put into operation? ()
Ⅰ.tart incinerator when it is cold
Ⅱ.he sludge for dealing with is little
Ⅲ.he sludge for dealing with is large
Ⅳ.he water and impurity in sludge are too much
Ⅴ.he temperature in incinerator is low
Ⅵ.ealing with little solid rubbish
A.Ⅰ+Ⅱ+Ⅲ+Ⅴ
B.Ⅰ+Ⅱ+Ⅲ+Ⅳ
C.Ⅰ+Ⅳ+Ⅴ+Ⅵ
D.Ⅰ+Ⅱ+Ⅲ+Ⅵ
您可能感兴趣的试卷
你可能感兴趣的试题
A.filled with clean water before operation
B.keep air cushion in oil collecting space during running
C.check oil level during running
D.clean inner separator with low pressure stream
A.pay attention to operating parameters
B.renew and clean separating units in time
C.check oil level in separator to prevent overload
D.check separating effect, if it is bad, flush with large capacity water pump
A.overhauling every two year
B.working at intervals
C.renewing filtration material
D.pumping bilge water from different layers respectively
A.working at intervals and properly heating
B.warming up to 70℃, increase water supply flow
C.improving impulse of water supply
D.reducing water supply flow
A.flushing separator with hot water
B.increasing water supply flow
C.heat oily water properly
D.opening manual oil discharge value
A.the separator is overload
B.the monitor equipment of separator fails
C.the discharge pump of separator can not work
D.the temperature of oil water is low
A.15;inlet value
B.15;inlet and outlet value
C.30;inlet value
D.30;inlet and outlet value
A.filled with bilge water
B.filled with oil
C.filled with clean water
D.be emptied
A.the sensor of low oil level is fully covered by sludge
B.the coarse strainer before the pump in suction system is clogged
C.the screw pump is worn seriously and volumetric efficiency is decreased
D.bilge suction value is clogged
A.the filter is clogged
B.bilge suction value is clogged
C.suction value and discharge value of the pump do not open fully
D.screw pump is worn seriously and volumetric efficiency is decreased
最新试题
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
The treatment of the fuel oils involves storage, heating, filtering and()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Under MARPOL Code the ship to which it applies has to carry ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
The ISPS Code consists of a mandatory section-Part A, which shows()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()