A.being given
B.giving
C.supplying
D.being supplied
您可能感兴趣的试卷
你可能感兴趣的试题
A.MARPOL Annex Ⅲ
B.MARPOL Annex Ⅵ
C.MARPOL Annex Ⅴ
D.MARPOL Annex Ⅳ
A.the International Convention for the Safety of the Life at Sea
B.the International Convention for the Prevention from ships
C.the International Convention on control of harmful anti-fouling system on ships
D.the International Convention for the Control and Management of Ship’s Ballast Water and Sediments
A.Revised MARPOL Annex Ⅰ
B.Revised MARPOL Annex Ⅱ
C.International convention for the control and management of ships ballast water and sediments
D.ISPS Code
A.competent authority
B.CSO
C.PSCO
D.Master
A.DOC
B.DOS
C.SSP
D.SMC
A.The Contracting Governments
B.The Port Authorities
C.The Master
D.The Company Security
A.an International Ship Security Certificate
B.an International Oil Pollution Certificate
C.a Safety Management Certificate
D.an International Ballast Water Management Certificate
A.an International Ship Security Certificate
B.an International Oil Pollution Prevention Certificate
C.a Safety Management Certificate
D.an International Ballast Water Management Certificate
A.an International Ship Security Certificate
B.an International Oil Pollution Certificate
C.a Safety Management Certificate
D.an International Ballast Water Management Certificate
A.precaution measures
B.safety measures
C.security measures
D.emergency response measures
最新试题
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Diesel engine air start system check valves are opened by ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which of the following items don’t belong to dock repair works?()
The ISPS Code consists of a mandatory section-Part A, which shows()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
() is not installed on the main switchboar.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish