A.pressure
B.velocity
C.gravity
D.viscosity
您可能感兴趣的试卷
你可能感兴趣的试题
A.the temperature
B.the viscosity
C.the gravity
D.the size
A.water level
B.water flow
C.temperature
D.pressure
A.flat
B.slat
C.sweet
D.acid
A.starters
B.pressure switches
C.pressure
D.water
A.forced circulating pump
B.compressed air
C.gravity tank
D.bead tank
A.total dissolved solids
B.temperature of distillation of sea water
C.total dissolved sodium
D.total delivery system
A.sea water
B.fresh water
C.vapour
D.gas
A.shell and tube type
B.plate type
C.coil type
D.conical disc type
A.temperature
B.velocity
C.density
D.viscosity
A.the low inertia
B.the high inertia
C.the low velocity
D.the high velocity
最新试题
The treatment of the fuel oils involves storage, heating, filtering and()
Using a file without a handle may result in ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The cetane rating of diesel fuel is an indication of the ()
To proceed to the assistance of a ship in distress is()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()